Offshore wind energy
Service Contractor:
- Workshop planning according to EN1090-2
- Installation planning according to EN1090-2
- Pre-fabrication of welded steel construction onshore
- Assembly of the pre-fabricated parts offshore
- Steel construction and welding work offshore
- Modification and adjustment work offshore
- Repair and maintenance work offshore
- Construction methods/Method Statement for the performing of the work offshore with regards to safety measures
- Risk Analysis for the Method Statement
Offshore Team:
- Project Manager/Site Engineer
- Welding Supervisor (IWE/IWS)
- NDT Inspector (Level 2 and Level 3: VT, PT, MT, UT, RT)
- Welder (Welding certificate according to DIN EN 287-1/DIN ISO 9606-1)
- Steel Worker
All offshore staff have the following offshore certificates:
- GWO First Aid
- GWO Working at Heights
- GWO Sea Survival
- GWO Fire Awareness
- Helicopter Underwater Escape Training incl. EBS/HUET